CALL US TODAY
08458 807 007

Roofing Replacement

Durasteel Project Design

Attention to detail is essential to the smooth running of any project.

In constant consultation with our clients at an early stage our estimators optimise the technical and value engineering requirements of a contract.

Once an order is received a handover meeting is held between the estimators, contracts staff and CAD designers to finalise design and programme in conjunction with the client.

The designers will then develop and finalise the detail design and regulation compliance to the client’s requirements.

Following thisÍž our CAD draughtsmen produce production drawings to ensure that all construction details work technically and aesthetically and so that our operatives know precisely how to sequence and assemble the systems on site in the most efficient way.

It is of course vital that the horizontal and vertical joints and the interfaces with windows and curtain walling are accurately gapped and aligned.

To achieve thisÍž the position of every panel, fixing, bracket and support framework was detail drawn as per the following examples. Templates were designed and fabricated for setting out on site and laser levelling was used for horizontal alignment.

 

Notice: Undefined variable: size in /var/www/vhosts/durasteelroofingservices.co.uk/httpdocs/wp-content/themes/durasteel/roofing.php on line 59 Notice: Undefined variable: size in /var/www/vhosts/durasteelroofingservices.co.uk/httpdocs/wp-content/themes/durasteel/roofing.php on line 60 Notice: Undefined variable: size in /var/www/vhosts/durasteelroofingservices.co.uk/httpdocs/wp-content/themes/durasteel/roofing.php on line 61 Notice: Undefined variable: size in /var/www/vhosts/durasteelroofingservices.co.uk/httpdocs/wp-content/themes/durasteel/roofing.php on line 62

Mr ER Murray, Director Electro Motion U.K (Export) Ltd

We wish to take this opportunity to place on record our sincere thanks for the excellent work recently carried out at our Barbky Road, Leicester works. Read More

Notice: Undefined variable: size in /var/www/vhosts/durasteelroofingservices.co.uk/httpdocs/wp-content/themes/durasteel/roofing.php on line 59 Notice: Undefined variable: size in /var/www/vhosts/durasteelroofingservices.co.uk/httpdocs/wp-content/themes/durasteel/roofing.php on line 60 Notice: Undefined variable: size in /var/www/vhosts/durasteelroofingservices.co.uk/httpdocs/wp-content/themes/durasteel/roofing.php on line 61 Notice: Undefined variable: size in /var/www/vhosts/durasteelroofingservices.co.uk/httpdocs/wp-content/themes/durasteel/roofing.php on line 62

The Powerhouse Wellingborough

Durasteel Clad our entire building ” The Powerhouse” on Rixon Rd Wellingborough. The workmanship was to an excellent standard and we would highly recommend them.

Kind regards

Geoff Morris

Notice: Undefined variable: size in /var/www/vhosts/durasteelroofingservices.co.uk/httpdocs/wp-content/themes/durasteel/roofing.php on line 59 Notice: Undefined variable: size in /var/www/vhosts/durasteelroofingservices.co.uk/httpdocs/wp-content/themes/durasteel/roofing.php on line 60 Notice: Undefined variable: size in /var/www/vhosts/durasteelroofingservices.co.uk/httpdocs/wp-content/themes/durasteel/roofing.php on line 61 Notice: Undefined variable: size in /var/www/vhosts/durasteelroofingservices.co.uk/httpdocs/wp-content/themes/durasteel/roofing.php on line 62

Mr Andy Cole, Managing Director-Gilbert Curry Industrial Plastics Co Ltd

We had two large industrial unit roofs removed and replaced in consecutive years by Durasteel Roofing.

I can confirm the work Durasteel roofing carried out was to a high standard of finish and we have been very pleased with the end result in both cases.

Quick Enquiry

  • Can't read the above security code? Refresh